Mumbai: The Maharashtra capital is one of the biggest and the most popular cities of India and while the residents love their city, the one thing that they probably collectively loathe is the infamous Mumbai Traffic. To ensure that the citizens of the city do not get stuck in the traffic and waste a lot of time, the Mumbai Traffic Police continues to issue traffic advisories for different areas on different days. In a latest Mumbai Traffic Update, the British-era Bellasis Bridge near Mumbai Central will remain closed for a duration of 18 months, starting on June 24, 2024. The bridge is being closed because it will first be demolished and then reconstructed.
As mentioned earlier, the Bellasis Bridge, near Mumbai Central will remain closed for a duration of 18 months from June 24, 2024. According to a notification issued by the Mumbai Traffic Police, suspension of vehicular traffic has been announced; this bridge connects Tardeo and Nagpada via Mumbai Central. The contract for demolition and reconstruction of the railway section of the bridge is worth Rs 24 crore and has been given to Western Railway (WR). The bridge, which was built in 1893, is 380-metre long and has also surpassed its lifespan of 100 years.
In another news, the river bridge on Dhadhar River in Vadodara district of Gujarat has been completed for the Bullet Train project. The Dhadhar River bridge is 120 metres long and consists of three Full Span Girders 40 metres each. The height of the piers is 16 metre to 20 metre and the four circular piers are of 4 metre and 5 metre in diameter. This bridge is in between Bharuch and Vadodara bullet train station. There are total 24 river bridges on Bullet Train corridor (Gujarat and Maharashtra) out of which 20 are in Gujarat and four are in Maharashtra.
The construction of seven river bridges on Par (320 m, Valsad district), Purna (360 m, Navsari district), Mindhola (240 m, Navsari district), Ambika (200 m, Navsari district), Auranga (320 m, Valsad district), Venganiya (200 m, Navsari district) and Mohar River (160 m, Kheda district) has already been completed. To ensure the safe operations of ambitious bullet train services, an automated Rainfall Monitoring System has been adopted. As per a statement from the National High Speed Rail Corporation Limited, the proposed system will provide real-time data on the rainfall using rain gauges, equipped with advanced instrumentation system.
(Inputs from ANI)
For breaking news and live news updates, like us on Facebook or follow us on Twitter and Instagram. Read more on Latest India News on India.com.
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts Cookies Policy.