New Delhi: In a major development that promises to make the traveling experience of passengers comfortable and convenient, the Indian Railways has completed the eighth steel bridge of the Mumbai-Ahmedabad Bullet Train project. This has marked nearly 50 percent progress on the 17 planned steel structures in the state.
It is important to note that the latest bridge, a 100-metre-long span, was successfully launched over Dedicated Freight Corridor (DFC) tracks near Bharuch. A total of 28 such bridges have been planned on the entire Mumbai-Ahmedabad high-speed rail corridor, with 17 in Gujarat.
To recall, the National High Speed Rail Corporation Limited (NHSRCL) had released a statement and informed that the bridge was assembled at the site at a height of 18 m from the ground on temporary trestles and was pulled with automatic mechanism of two semi-automatic jacks, each of capacity of 250 ton using mac-alloy bars.
To minimise disruption to freight movement, the launch was executed through carefully phased traffic blocks on the DFC tracks. With this, the high-speed corridor in Gujarat section now has eight completed steel bridges at key locations including Surat, Vadodara, Nadiad, Silvassa and Bharuch.
For breaking news and live news updates, like us on Facebook or follow us on Twitter and Instagram. Read more on Latest India News on India.com.
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts Cookies Policy.