Reach Surat to Mumbai in 2 Hours: Railways Ashwini Vaishnaw confirms BIG update on India’s first bullet train; check route details

Railway Minister Ashwini Vaishnav has announced that India’s first bullet train will travel between Surat and Vapi during in its inaugural service in August 2027.

Edited by: Abhijeet Sen
Updated: November 20, 2025, 7:42 PM IST

Mumbai-Ahmedabad high-speed rail corridor: In a significant infrastructure development, India’s long-awaited leap into the era of high-speed rail is finally taking shape. With the country’s first bullet train set to begin operations on a 100 km stretch between Surat and Vapi in Gujarat by August 2027, India is set to create history. Here are all the details you need to know about the recent updates on Mumbai-Ahmedabad high-speed rail corridor.

Union Railway Minister Ashwini Vaishnaw confirms major update

In the latest development in Mumbai-Ahmedabad high-speed rail corridor project, Union Railway Minister Ashwini Vaishnaw has confirmed that the bullet train will mark a defining moment in India’s transport history, signalling the transition from conventional rail travel to world-class high-speed connectivity.

Readers can note that the inaugural run will not be limited to a symbolic trial. It forms part of the ambitious Mumbai-Ahmedabad high-speed rail corridor, a 508 km project engineered to support train speeds of up to 320 km per hour.

Reach Surat to Mumbai in 2 hours

India’s first bullet train will run on a 100 km section between Surat and Vapi in Gujarat during its inaugural service in August 2027, Railway Minister Ashwini was quoted as saying by a PTI report.

Once fully operational, the corridor will dramatically reduce travel time between the financial capital and Gujarat’s largest city. According to Union Minister Vaishnaw, a non-stop journey with halts at only four key stations will take just 1 hour and 58 minutes. If the train stops at all 12 designated stations, the travel time will extend slightly to 2 hours and 17 minutes.

The project has also crossed a significant engineering milestone with the successful breakthrough of a complex tunnel on the corridor. Describing it as a “landmark achievement”, the minister highlighted the scale of the challenge involved in building the single-tube, 13.1-metre diameter tunnel designed to carry bullet trains in both directions.

Add India.com as a Preferred Source Add India.com as a Preferred Source

For breaking news and live news updates, like us on Facebook or follow us on Twitter and Instagram. Read more on Latest News News on India.com.

By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts Cookies Policy.